LM3447-A19-230VEVM, Evaluation Board using LM3447 PFC Flyback Controller for LED Lighting
Progetto di riferimento usando la parte LM3447MT di Texas Instruments
Per prodotti finali
- LED Bulb
Per contattare il Servizio Clienti.
- LM3447-A19-230VEVM, Evaluation Board is a 10-W, 230-VAC isolated dimmable LED driver. The LM3447-A19-230VEVM is a primary-side power regulated PFC controller used for commercial and residential phase-cut dimmer compatible LED lamp drivers. The LM3447-A19-230VEVM uses fixed frequency valley switching operation resulting in discontinuous current operation
Funzioni principali
-
Input Voltage190 to 265 (AC) V
-
Output Voltage28 to 32 V
-
Output Current0.31 A
-
Number of Derived Elements9 to 10
Parti in primo piano (6)
| Numero parte | Produttore | Tipo | Per contattare il Servizio Clienti. | |||
|---|---|---|---|---|---|---|
|
|
LM3447MTE/NOPB | Texas Instruments | LED Drivers | LED Driver 10000uA Supply Current 14-Pin TSSOP T/R | ACQUISTA | |
|
|
LM3447MTE/NOPB | Texas Instruments | LED Drivers | LED Driver 10000uA Supply Current 14-Pin TSSOP T/R | ACQUISTA | |
|
|
LM3447MT/NOPB | Texas Instruments | LED Drivers | LED Driver 10000uA Supply Current 14-Pin TSSOP Tube | ACQUISTA | |
|
|
LM3447MTX/NOPB | Texas Instruments | LED Drivers | LED Driver 10000uA Supply Current 14-Pin TSSOP T/R | ACQUISTA | |
|
|
LM3447MTX/NOPB | Texas Instruments | LED Drivers | LED Driver 10000uA Supply Current 14-Pin TSSOP T/R | ACQUISTA | |
|
|
LM3447MT/NOPB | Texas Instruments | LED Drivers | LED Driver 10000uA Supply Current 14-Pin TSSOP Tube | ACQUISTA | |