DDC264EVM, provides an easy-to-use platform for evaluating the DDC264 charge digitizing A/D converters
Progetto di riferimento usando la parte DDC264CKZAW di Texas Instruments
Per prodotti finali
- CT Scanner
- Digital X-Ray
- Photodiode Sensor
Per contattare il Servizio Clienti.
- DDC264EVM, provides an easy-to-use platform for evaluating the DDC264 charge digitizing A/D converters. A PC interface board and four DDC264 devices are included along with software that makes analysis and testing of these devices manageable
Funzioni principali
-
ADC Resolution20 Bit
-
ADC Sampling Rate6.25K SPS
-
Number of Channels64CH
Parti in primo piano (25)
| Numero parte | Produttore | Tipo | Per contattare il Servizio Clienti. | |||
|---|---|---|---|---|---|---|
|
|
OPA350EA/2K5 | Texas Instruments | Operational Amplifiers - Op Amps | Op Amp Single Precision Amplifier R-R I/O ±2.75V/5.5V 8-Pin VSSOP T/R | ACQUISTA | |
|
|
OPA350EA/2K5G4 | Texas Instruments | Operational Amplifiers - Op Amps | Op Amp Single Precision Amplifier R-R I/O ±2.75V/5.5V 8-Pin VSSOP T/R | ACQUISTA | |
|
|
IS61WV102416BLL-10TLI | Integrated Silicon Solution Inc | SRAM Chip | SRAM Chip Async Single 2.5V/3.3V 16M-bit 1M x 16 10ns 48-Pin TSOP-I Bulk/T/R | ACQUISTA | |
|
|
OPA350EA/250G4 | Texas Instruments | Operational Amplifiers - Op Amps | Op Amp Single Precision Amplifier R-R I/O ±2.75V/5.5V 8-Pin VSSOP T/R | ACQUISTA | |
|
|
REG113NA-3.3/250G4 | Texas Instruments | Linear Regulators | LDO Regulator Pos 3.3V 0.4A 5-Pin SOT-23 T/R | ACQUISTA | |
|
|
REG113NA-2.5/3K | Texas Instruments | Linear Regulators | LDO Regulator Pos 2.5V 0.4A 5-Pin SOT-23 T/R | ACQUISTA | |
|
|
REG113NA-2.5/250 | Texas Instruments | Linear Regulators | LDO Regulator Pos 2.5V 0.4A 5-Pin SOT-23 T/R | ACQUISTA | |
|
|
24LC00-I/ST | Microchip Technology | EEPROM | EEPROM Serial-I2C 128-bit 16 x 8 3.3V/5V 8-Pin TSSOP Tube | ACQUISTA | |
|
|
REG1117-5 | Texas Instruments | Linear Regulators | LDO Regulator Pos 5V 0.8A 4-Pin(3+Tab) SOT-223 Tube | ACQUISTA | |
|
|
REG113NA-2.5/250G4 | Texas Instruments | Linear Regulators | LDO Regulator Pos 2.5V 0.4A 5-Pin SOT-23 T/R | ACQUISTA | |
|
|
REG113NA-2.5/250 | Texas Instruments | Linear Regulators | LDO Regulator Pos 2.5V 0.4A 5-Pin SOT-23 T/R | ACQUISTA | |
|
|
REG113NA-3.3/3K | Texas Instruments | Linear Regulators | LDO Regulator Pos 3.3V 0.4A 5-Pin SOT-23 T/R | ACQUISTA | |