TPS82693EVM-207/TPS82693 800-mA, High-Efficiency MicroSiP Step-Down Converter Evaluation Module Board
Using Part
Vignette
1 / 2
Pour les produits finaux
- Cellular Phone
- Electrocardiograph Battery Powered
- Smart Phone
Description
- TPS82693EVM-207/TPS82693 800-mA, High-Efficiency MicroSiP Step-Down Converter Evaluation Module Board. This EVM is designed to help the user easily evaluate and test the operation and functionality of the TPS82693. The EVM converts 2.85 V (TPS82693) output voltage that delivers 800 mA
Caractéristiques principales
-
Conversion TypeDC to DC
-
Input Voltage2.3 to 4.8 V
-
Output Voltage2.85 V
-
Output Current0.8 A
-
TopologyBuck
Pièces en vedette (2)
| Pièce numéro | Fabricant | Type | Description | |||
|---|---|---|---|---|---|---|
|
|
TPS82693SIPR | Texas Instruments | DC to DC Converter and Switching Regulator Module | Module DC-DC 1-OUT 2.85V 0.8A 8-Pin uSIP T/R | Ajouter au panier | |
|
|
TPS82693SIPT | Texas Instruments | DC to DC Converter and Switching Regulator Module | Module DC-DC 1-OUT 2.85V 0.8A 8-Pin uSIP T/R | Ajouter au panier | |