TPS65311EVM, Evaluation Module for TPS65311-Q1 Power Supply IC for Safety Applications
Using Part
Vignette
1 / 4
Pour les produits finaux
- Safety System
Description
- TPS65311EVM, Evaluation Module (EVM) help engineers evaluate the operation and performance of the TPS65311-Q1 power supply IC for safety applications. The devices offer configurability through the Serial Peripheral Interface (SPI). The EVM contains the TPS65311-Q1 and some circuitry for basic operation. It has an on board USB-to-SPI interface but can also run without it or with a different SPI interface, for example, from an MCU supplied to the EVM
Caractéristiques principales
-
Conversion TypeDC to DC
-
Input Voltage4.8 to 36 V
Pièces en vedette (1)
| Pièce numéro | Fabricant | Type | Description | |||
|---|---|---|---|---|---|---|
|
|
TPS65310AQRVJRQ1 | Texas Instruments | PMIC Solutions | Power Management IC 4.8V to 40V 56-Pin VQFN EP T/R Automotive AEC-Q100 | Ajouter au panier | |