25W, 2-Channel, Class-D Audio Power Amplifier for Television
Using Part
Vignette
1 / 2
Documents connexes
Pour les produits finaux
- Television
Description
- TPA3123D2 evaluation module consists of a single 25-W, class-D, stereo audio power amplifier complete with a small number of external components mounted on a circuit board that are used to directly drive speakers with an external analog audio source as input
Caractéristiques principales
-
Number of Channels2
-
Output Power25 W
-
Amplifier TypeClass-D
Pièces en vedette (5)
| Pièce numéro | Fabricant | Type | Description | |||
|---|---|---|---|---|---|---|
|
|
TLV431ACDBZR | Texas Instruments | Voltage References | V-Ref Adjustable 1.24V to 6V 15mA 3-Pin SOT-23 T/R | Ajouter au panier | |
|
|
TLV431ACDBZRG4 | Texas Instruments | Voltage References | V-Ref Adjustable 1.24V to 6V 15mA 3-Pin SOT-23 T/R | Ajouter au panier | |
|
|
TPA3123D2PWPRG4 | Texas Instruments | Audio Amplifiers | Audio Amp Speaker 2-CH Stereo 20W Class-D 24-Pin HTSSOP EP T/R | Ajouter au panier | |
|
|
TPA3123D2PWP | Texas Instruments | Audio Amplifiers | Audio Amp Speaker 2-CH Stereo 20W Class-D 24-Pin HTSSOP EP Tube | Ajouter au panier | |
|
|
TPA3123D2PWPR | Texas Instruments | Audio Amplifiers | Audio Amp Speaker 2-CH Stereo 20W Class-D 24-Pin HTSSOP EP T/R | Ajouter au panier | |