Typical Application Circuit for A8586KLJTR-T Wide Input Voltage, Adjustable Frequency, 3.5A Buck Regulator with Critical Paths/Loops Shown

使用 Allegro MicroSystems 的 A8586KLJTR-T 的参考设计

供应商

Allegro MicroSystems
  • 应用类别
    电源
  • 产品类别
    直流到直流单输出电源

依据最终产品

  • Automotive Applications
  • Battery Powered Systems
  • Distributed Power System
  • Industrial Power Supply
  • Power Conversion

说明

  • Typical Application Circuit for A8586KLJTR-T Wide Input Voltage, Adjustable Frequency, 3.5A Buck Regulator with Critical Paths/Loops Shown. The A8586 is a high frequency step-down switching regulator with an integrated high-side power MOSFET. It provides up 3.5A output current. The A8586 can achieve fast transient response using current-mode control and simple external compensation. The wide input range of 3.8 to 36 V makes the A8586 suitable for a wide range of step-down applications, including those in an automotive input environment. Battery-driven applications benefit from the low 30 uA operational quiescent current

主要特色

  • Conversion Type
    DC to DC
  • Input Voltage
    3.8 to 36 V
  • Output Voltage
    0.8 to 30 V
  • Output Current
    3.5 A
  • Topology
    Buck

请仔细阅读我们近期更改的隐私政策。当按下确认键时,您已了解并同意艾睿电子的隐私政策和用户协议。

本网站需使用cookies以改善用户您的体验并进一步改进我们的网站。此处阅读了解关于网站cookies的使用以及如何禁用cookies。网页cookies和追踪功能或許用于市场分析。当您按下同意按钮,您已经了解并同意在您的设备上接受cookies,并给予网站追踪权限。更多关于如何取消网站cookies及追踪的信息,请点击下方“阅读更多”。尽管同意启用cookies追踪与否取决用户意愿,取消网页cookies及追踪可能导致网站运作或显示异常,亦或导致相关推荐广告减少。

我们尊重您的隐私。请在此阅读我们的隐私政策。