TPS53015EVM-126, Evaluation Board using TPS53015 Single Synchronous Step-Down Controller for Low-Voltage Power Rails

使用 Texas Instruments 的 TPS53015DGS 的参考设计

供应商

Texas Instruments
  • 应用类别
    电源
  • 产品类别
    直流到直流单输出电源

依据最终产品

  • DVD Player/Recorder
  • Game Console
  • Networking Home Terminal
  • Power Supplies
  • Set-Top Box

说明

  • TPS53015EVM-126, Evaluation Board provides the user with a convenient way to evaluate the TPS53015 D-CAP2 mode control in a cost sensitive application. Providing a 1.05-V output at up to 8 A from a loosely regulated 12 V (8 V 22 V) source, the TPS53015EVM-126 is designed to demonstrate the TPS53015 in a typical point-of-load application while providing a number of test points to evaluate the performance of the TPS53015

主要特色

  • Conversion Type
    DC to DC
  • Input Voltage
    8 to 22 V
  • Output Voltage
    1.05 V
  • Output Current
    8 A
  • Efficiency
    86.5 %
  • Topology
    Buck

请仔细阅读我们近期更改的隐私政策。当按下确认键时,您已了解并同意艾睿电子的隐私政策和用户协议。

本网站需使用cookies以改善用户您的体验并进一步改进我们的网站。此处阅读了解关于网站cookies的使用以及如何禁用cookies。网页cookies和追踪功能或許用于市场分析。当您按下同意按钮,您已经了解并同意在您的设备上接受cookies,并给予网站追踪权限。更多关于如何取消网站cookies及追踪的信息,请点击下方“阅读更多”。尽管同意启用cookies追踪与否取决用户意愿,取消网页cookies及追踪可能导致网站运作或显示异常,亦或导致相关推荐广告减少。

我们尊重您的隐私。请在此阅读我们的隐私政策。