过滤器
| 说明 | 依据发布人 | 依据应用 | 依据最终产品 | |||
|---|---|---|---|---|---|---|
AKD4637-B |
Asahi Kasei Microdevices Corporation | CODEC | Digital Camera, Multifunction Printer, IP Camera | |||
A6213 EVB |
Allegro MicroSystems | Lighting | Illumination, Industrial LED Lighting, Multifunction Printer, Scanners | |||
A6211_Typical ApplicationTypical Application for A6211 3A Constant Current, PWM Dimmable, Buck Regulator LED Driver |
Allegro MicroSystems | Lighting | Illumination, Multifunction Printer, Industrial Lighting, Scanners, Architectural Lighting | |||
A6211 EVB |
Allegro MicroSystems | Lighting | Illumination, Industrial LED Lighting, Multifunction Printer, Scanners | |||
AN5020 |
Analog Devices | Wired Communication | Industrial, Set-Top Box, Medical and Healthcare, Digital Video Recorder, Telemetry, Fax Machine, POS Register, Multifunction Printer | |||
MAX12934BWEVKIT# |
Analog Devices | Isolation | Multifunction Printer, Sensors, Smart Metering | |||
MAX12934FWEVKIT# |
Analog Devices | Isolation | Multifunction Printer, Sensors, Smart Metering | |||
MAX12935BWEVKIT# |
Analog Devices | Isolation | Multifunction Printer, Sensors, Smart Metering | |||
MAX12935FWEVKIT# |
Analog Devices | Isolation | Multifunction Printer, Sensors, Smart Metering | |||
AN5017 |
Analog Devices | Wired Communication | Industrial, Set-Top Box, Medical and Healthcare, Digital Video Recorder, Telemetry, Fax Machine, POS Register, Multifunction Printer | |||
LV8760T/61V-DForward/Reverse H-bridge Driver Application Note Using the Current Limit Function |
onsemi | Motor Control | Industrial, Copier, Home Entertainment, Multifunction Printer, Cash Drawer, Scanners | |||
LV8760T/61V-DForward/Reverse H-bridge Driver Application Note Not Using the Current Limit Function |
onsemi | Motor Control | Industrial, Copier, Home Entertainment, Multifunction Printer, Cash Drawer, Scanners | |||
LV8760T/61V-DForward/Reverse H-bridge Driver Application Note for Stepping Motor Drive Applications |
onsemi | Motor Control | Industrial, Copier, Home Entertainment, Multifunction Printer, Cash Drawer, Scanners | |||
TPS51220AEVM-476TPS51220AEVM-476, High performance Dual Output Synchronous Buck Evaluation Module |
Texas Instruments | Power Supplies | Notebook, Laptop, Digital TV, Multifunction Printer | |||
TIDA-00517TIDA-00517, Basic Fan Controller Reference Design with Over-Temperature Detection |
Texas Instruments | Measurement and Monitoring | Factory Automation, Telecom Infrastructure, Audio Amplifier, Multifunction Printer, Printers | |||
TIDA-00867TIDA-00867, 24V Stepper Motor Controller with Integrated Current Sense Reference Design |
Texas Instruments | Motor Control | Factory Automation, Robotics, Automatic Teller Machine, Multifunction Printer, Laser Printer, 3D Printer, Security Camera, Scanners | |||
TPS53311EVM-561Using the TPS53311EVM-561, a 3-A Eco-mode Integrated Switcher With Master-Slave |
Texas Instruments | Power Supplies | Notebook, Laptop, Servers, Embedded PC, Ethernet Router and Ethernet Switch, Netbook, Energy Meter, Multifunction Printer | |||
S6AP413A_Typical Application |
Infineon Technologies AG | Power Supplies | Factory Automation, Home Appliances, Security System, Copier, Surveillance Camera, Multifunction Printer, Network Equipment, Musical Instrument Processor, Storage System, Mobile Accessories, Scanners | |||
S6AP413A_Typical Application |
Infineon Technologies AG | Power Supplies | Factory Automation, Home Appliances, Security System, Copier, Surveillance Camera, Multifunction Printer, Network Equipment, Musical Instrument Processor, Storage System, Mobile Accessories, Scanners | |||
S6AP413A_Typical Application |
Infineon Technologies AG | Power Supplies | Factory Automation, Home Appliances, Security System, Copier, Surveillance Camera, Multifunction Printer, Network Equipment, Musical Instrument Processor, Storage System, Mobile Accessories, Scanners | |||