DRV2625EVM-MINI, Breakout Evaluation Board for DRV2625 ERM/LRA Haptics
使用 Texas Instruments 的 DRV2625YFF 的参考设计
Image
1 / 2
依据最终产品
- Cellular Phone
- Human Machine Interface (HMI)
- Tablet
- Wearable Electronics
说明
- DRV2625EVM-MINI, Breakout Evaluation Board for DRV2625 ERM/LRA Haptics. The DRV2625EVM-MINI is a small, break-out board for the DRV2625 ERM/LRA Haptics driver. The board can be used for quickly integrating the DRV2625 into any new or existing system. The DRV2625 is an ultra low power haptic driver with integrated waveform library for driving eccentric rotating mass (ERM) or linear resonant actuators (LRA). The board includes the DRV2625 along with the required passive components to operate the DRV2625. Simply connect power, I2C communication and an actuator to get started with the DRV2625
Featured Parts (2)
| 零件编号 | 供应商 | 类别 | 说明 | |||
|---|---|---|---|---|---|---|
|
|
DRV2625YFFT | Texas Instruments | Motor Controller and Driver ICs | Haptic Driver 9-Pin DSBGA T/R | 买入 | |
|
|
DRV2625YFFR | Texas Instruments | Motor Controller and Driver ICs | Haptic Driver 9-Pin DSBGA T/R | 买入 | |