BQ27426EVM-738, Evaluation Module for BQ27426 Single-Cell Impedance Track Technology

使用 Texas Instruments 的 BQ27426YZFR 的参考设计

供应商

Texas Instruments
  • 应用类别
    电池管理
  • 产品类别
    电池电力测定

依据最终产品

  • Building Automation
  • Gaming Device
  • Handsets
  • Portable Audio
  • Portable Medical Instrumentation
  • Smart Phone
  • Tablet
  • Wearable Electronics

说明

  • BQ27426EVM-738, BQ27426 EVM Module for Impedance Track Fuel Gauge w/Easy to Use Pre-programmed Chemistry Profiles. The BQ27426EVM-738 evaluation module is a complete evaluation system for the bq27426. The EVM includes one bq27426 circuit module with an external sense resistor. A separated orderable EV2300 or EV2400 PC interface board for gas gauge interface along with a PC USB cable and Windows-based PC software is needed when using this EVM. The circuit module connects directly across the battery pack

主要特色

  • Battery Type
    Lithium-Ion
  • Input Voltage
    2.5 to 4.5 V
  • Number of Battery Cells
    1

请仔细阅读我们近期更改的隐私政策。当按下确认键时,您已了解并同意艾睿电子的隐私政策和用户协议。

本网站需使用cookies以改善用户您的体验并进一步改进我们的网站。此处阅读了解关于网站cookies的使用以及如何禁用cookies。网页cookies和追踪功能或許用于市场分析。当您按下同意按钮,您已经了解并同意在您的设备上接受cookies,并给予网站追踪权限。更多关于如何取消网站cookies及追踪的信息,请点击下方“阅读更多”。尽管同意启用cookies追踪与否取决用户意愿,取消网页cookies及追踪可能导致网站运作或显示异常,亦或导致相关推荐广告减少。

我们尊重您的隐私。请在此阅读我们的隐私政策。