16-Bit, 250KSPS, 6CH ADC for Motion Motor Control
Reference Design using part ADS8364 by Texas Instruments
Associated Documents
- OPA2350 CAD symbol
- OPA2132 CAD symbol
- OPA2350 CAD symbol
- SN74AHC1G04 CAD symbol
- SN74AHC1G04 CAD symbol
- OPA2132 TINA SPICE
- OPA2132 CAD symbol
- SN74AHC1G04-Q1 CAD symbol
- SN74AHC1G04-Q1 CAD symbol
- OPA2132 PSPICE
- OPA2350 CAD symbol
- TPS2104 CAD symbol
- SN74AHC1G04 CAD symbol
- SN74CBT3257 CAD symbol
- ADS8364 CAD symbol
For End Products
- Motion Motor Control
Description
- ADS8364 is a high-speed, low power, dual 16-bit A/D converter that operates from independent 5-V AVDD and DVDD supplies
Key Features
-
ADC Resolution16 Bit
-
ADC Sampling Rate250K SPS
-
Number of Channels6CH
Featured Parts (53)
| Part Number | Manufacturer | Type | Description | |||
|---|---|---|---|---|---|---|
|
|
SN74CBT3257PWRG4 | Texas Instruments | Bus Switches | Multiplexer/Demultiplexer Bus Switch 1-Element CMOS 8-IN 16-Pin TSSOP T/R | Buy | |
|
|
OPA2132U/2K5E4 | Texas Instruments | Operational Amplifiers - Op Amps | Op Amp Dual High Speed Amplifier ±18V 8-Pin SOIC T/R | Buy | |
|
|
OPA2350EA/250G4 | Texas Instruments | Operational Amplifiers - Op Amps | Op Amp Dual Precision Amplifier R-R I/O ±2.75V/5.5V 8-Pin VSSOP T/R | Buy | |
|
|
OPA2350EA/2K5G4 | Texas Instruments | Operational Amplifiers - Op Amps | Op Amp Dual Precision Amplifier R-R I/O ±2.75V/5.5V 8-Pin VSSOP T/R | Buy | |
|
|
SN74AHC1G04DCKTE4 | Texas Instruments | Inverters and Schmitt Triggers | Inverter 1-Element CMOS 5-Pin SC-70 T/R | Buy | |
|
|
SN74AHC1G04DBVTG4 | Texas Instruments | Inverters and Schmitt Triggers | Inverter Schmitt Trigger 1-Element CMOS 5-Pin SOT-23 T/R | Buy | |
|
|
TPS2104DBVR | Texas Instruments | Power Muxes | Pwr Mux 2.7V to 5.5V 0.5A 5-Pin SOT-23 T/R | Buy | |
|
|
OPA2350EA/250 | Texas Instruments | Operational Amplifiers - Op Amps | Op Amp Dual Precision Amplifier R-R I/O ±2.75V/5.5V 8-Pin VSSOP T/R | Buy | |
|
|
OPA2350EA/250 | Texas Instruments | Operational Amplifiers - Op Amps | Op Amp Dual Precision Amplifier R-R I/O ±2.75V/5.5V 8-Pin VSSOP T/R | Buy | |
|
|
OPA2350EA/250G4 | Texas Instruments | Operational Amplifiers - Op Amps | Op Amp Dual Precision Amplifier R-R I/O ±2.75V/5.5V 8-Pin VSSOP T/R | Buy | |
|
|
SN74AHC1G04DBVR | Texas Instruments | Inverters and Schmitt Triggers | Inverter Schmitt Trigger 1-Element CMOS 5-Pin SOT-23 T/R | Buy | |
|
|
TPS2104DBVT | Texas Instruments | Power Muxes | Pwr Mux 2.7V to 5.5V 0.5A 5-Pin SOT-23 T/R | Buy | |