Filters
| Description | Released By | For Application | For End Products | |||
|---|---|---|---|---|---|---|
USB-SMBUS-CABLEZUSB-SMBUS-CABLEZ, Evaluation Board for the SOC Microprocessor USB Interface for Notebook |
Analog Devices | Interface | Notebook, Laptop | |||
MAX3420E EVKIT-1MAX3420E EVKIT-1, Evaluation Kit for the MAX3420 SPI-to-USB Peripheral and USB Interface |
Analog Devices | Interface | Cellular Phone, Personal Digital Assistant, Instrumentation and Measurement, Digital Camera, Set-Top Box, MP3 Player, Computers and Peripherals, Industrial Programmable Logic Controllers (PLCs) | |||
TIDA-00287 |
Texas Instruments | Interface | Set-Top Box, Computers and Peripherals, LCD Monitor, Docking Station | |||
TPS2071EVM-159TPS2071EVM-159, Evaluation Board for the TPS2071 hybrid USB hub controller |
Texas Instruments | Interface | ADSL Modem, Wired Keyboard, Scanners, Printers | |||
TUSB3410UARTPDKTUSB3410UARTPDK, Evaluation Board for TUSB3410 SOC Microprocessor USB Interface for Desktop PC |
Texas Instruments | Interface | Desktop PC | |||
CY4609 |
Infineon Technologies AG | Interface | Set-Top Box, Video and Imaging, Digital TV, Docking Station, Displays and Monitors, Handheld POS Scanner, Tablet, Printers and Imaging Device | |||
CY4603 |
Infineon Technologies AG | Interface | Set-Top Box, Video and Imaging, Digital TV, Docking Station, Displays and Monitors, Handheld POS Scanner, Tablet, Printers and Imaging Device | |||
CY4613 |
Infineon Technologies AG | Interface | Set-Top Box, Video and Imaging, Digital TV, Docking Station, Displays and Monitors, Handheld POS Scanner, Tablet, Printers and Imaging Device | |||
AN56857 |
Infineon Technologies AG | Interface | Notebook, Portable Media Player | |||
AN14705 |
Infineon Technologies AG | Interface | USB Dongle, USB Wireless | |||
MCP2200EV-VCPMCP2200EV-VCP, Evaluation Board for MCP2200 SOC Microprocessor USB Interface for Industrial |
Microchip Technology | Interface | Industrial | |||
MIC3003MIC3003, Evaluation Board for SOC Microprocessor USB Interface for SONET |
Microchip Technology | Interface | Optical Networking, SONET | |||
TUSB3210EVMTUSB3210EVM, Evaluation Board for TUSB3210 SOC Microprocessor USB Interface for Desktop PC |
Texas Instruments | Interface | Desktop PC, Wired Keyboard | |||
TIDA-00288 |
Texas Instruments | Interface | Notebook, Desktop PC | |||
UMFT311EVUMFT311EV, USB Android Host Development Module based on FT311D |
Future Technology Devices International Limited | Interface | Smart Phone, Data Logger, Tablet, USB Interfaces | |||