American Power ConversionWSITEINSPEC-G5-81

(1) Site Inspection Visit For (1) Galaxy 5000/5500 41 To 80kVA

No Stock Available

Quantity Increments of 1 Minimum 1
  • Manufacturer Lead Time:
    8 weeks
    • Price: $1,802.53
    1. 1+$1,802.53
    2. 10+$1,784.51
    3. 25+$1,766.66
    4. 50+$1,748.99
    5. 100+$1,731.50
    6. 250+$1,714.19
    7. 500+$1,471.96
    8. 1000+$1,457.37
    9. 5000+$1,457.26

Design AI-powered medical devices

Explore system design tips, part recs and AI insights to help you build faster, safer diagnostic and therapy solutions—all in Arrow’s latest white paper.