Altech CorporationPMRBU-GEConnector Power

Conn Power RCP 3 POS Screw ST Panel Mount 3 Terminal 1 Port

No Stock Available

Quantity Increments of 1 Minimum 1
  • Manufacturer Lead Time:
    20 weeks
    • Price: $12.125
    1. 1+$12.125
    2. 10+$12.004
    3. 25+$11.884
    4. 50+$11.765
    5. 100+$11.647
    6. 250+$11.531
    7. 500+$11.415
    8. 1000+$11.301
    9. 5000+$11.188

Design AI-powered medical devices

Explore system design tips, part recs and AI insights to help you build faster, safer diagnostic and therapy solutions—all in Arrow’s latest white paper.