BivarLC-76.0LED Light Pipes

LED Light Pipe Round Vertical Clear Flexible Bag

No Stock Available

Quantity Increments of 1 Minimum 100
  • Manufacturer Lead Time:
    12 weeks
    • Price: $7.929
    1. 1+$7.929
    2. 500+$7.800
    3. 1000+$7.697
    4. 5000+$7.583
    5. 10000+$7.470
    6. 25000+$7.304

Design AI-powered medical devices

Explore system design tips, part recs and AI insights to help you build faster, safer diagnostic and therapy solutions—all in Arrow’s latest white paper.