BivarFLP2FR12.0-SBCLED Light Pipes

LED Light Pipe Round Right Angle Green/Red Flexible Bag

No Stock Available

Quantity Increments of 1 Minimum 100
  • Manufacturer Lead Time:
    12 weeks
    • Price: $3.334
    1. 1+$3.334
    2. 500+$3.301
    3. 1000+$3.268
    4. 5000+$3.235
    5. 10000+$3.203
    6. 25000+$2.096

Design AI-powered medical devices

Explore system design tips, part recs and AI insights to help you build faster, safer diagnostic and therapy solutions—all in Arrow’s latest white paper.