Hammond ManufacturingC3RWT660

Gray Galvanized Steel Type 3R Wiring Trough

Import TariffMay apply to this part

No Stock Available

Quantity Increments of 1 Minimum 1
  • Manufacturer Lead Time:
    2 weeks
    • Price: $164.64
    1. 1+$164.64
    2. 10+$163.00
    3. 25+$161.37
    4. 50+$159.75
    5. 100+$158.16
    6. 250+$156.58
    7. 500+$155.01
    8. 1000+$153.46
    9. 5000+$151.92

Design AI-powered medical devices

Explore system design tips, part recs and AI insights to help you build faster, safer diagnostic and therapy solutions—all in Arrow’s latest white paper.