Molex2162701024其他电缆组件

Cable Assembly UL 11028 0.6m 22AWG Wire to Board to Wire to Board 2 to 2 POS F-F Crimp-Crimp Bag

No Stock Available

Quantity Increments of 1 Minimum 1950
  • Manufacturer Lead Time:
    20 星期
    • Price: $2.005
    1. 1+$2.005
    2. 4000+$1.822
    3. 10000+$1.803
    4. 20000+$1.775
    5. 50000+$1.741

Smarter Drone Systems from Concept to Deployment

Download the playbook and get equipped with powerful tools and smart strategies for designing agile, efficient, modular drone systems.