TIDA-00009, Body Weight Scale with Body Composition capability and BLE Connectivity
Diseño de referencia usando la pieza MSP430F5528IRGCT de Texas Instruments
Documentos asociados
Para productos finales
- Health System
- Notebook
- Smart Phone
- Tablet
- Weight Scale
Descripción
- TIDA-00009, This reference design is for a complete body weight scale end equipment with body composition capability featuring signal chain, power, and connectivity components. With AFE4300 weigh scale/body composition AFE, you can accelerate your body weight scale design or quickly add body composition measurement features to your existing platform. This reference design also includes the full BLE connectivity design for easy interface to BLE enabled SmartPhones, tablets
Características clave
-
Embedded System TypeMCU
-
Family NameMSP430
Piezas destacadas (6)
| Número de pieza | Fabricante | Tipo | Descripción | |||
|---|---|---|---|---|---|---|
|
|
AFE4300PNR | Texas Instruments | Analog Front End - AFE | AFE General Purpose 1 ADC 16bit 3.3V 80-Pin LQFP T/R | AÑADIR AL CARRITO | |
|
|
TPS735285DRVR | Texas Instruments | Linear Regulators | LDO Regulator Pos 2.85V 0.5A 6-Pin WSON EP T/R | AÑADIR AL CARRITO | |
|
|
LTC2951CDDB-1#TRPBF | Analog Devices | Power Supply Controllers and Monitors | Processor Supervisor 0.8V 1 8-Pin DFN EP T/R | AÑADIR AL CARRITO | |
|
|
TPS735285DRVT | Texas Instruments | Linear Regulators | LDO Regulator Pos 2.85V 0.5A 6-Pin WSON EP T/R | AÑADIR AL CARRITO | |
|
|
LTC2951CDDB-1#TRMPBF | Analog Devices | Power Supply Controllers and Monitors | Processor Supervisor 0.8V 1 8-Pin DFN EP T/R | AÑADIR AL CARRITO | |
|
|
MSP430F5528IRGCT | Texas Instruments | Microcontrollers - MCUs | MCU 16-bit MSP430 RISC 128KB Flash 2.5V/3.3V 64-Pin VQFN EP T/R | AÑADIR AL CARRITO | |